DRGW tops the SP Manifest

  • warning: Division by zero in /homepages/28/d246274153/htdocs/free-mo.org/includes/image.inc on line 197.
  • warning: imagecreatetruecolor(): Invalid image dimensions in /homepages/28/d246274153/htdocs/free-mo.org/includes/image.gd.inc on line 94.
  • warning: imagecopyresampled() expects parameter 1 to be resource, boolean given in /homepages/28/d246274153/htdocs/free-mo.org/includes/image.gd.inc on line 120.
  • warning: imagejpeg() expects parameter 1 to be resource, boolean given in /homepages/28/d246274153/htdocs/free-mo.org/includes/image.gd.inc on line 211.
  • warning: imagedestroy() expects parameter 1 to be resource, boolean given in /homepages/28/d246274153/htdocs/free-mo.org/includes/image.gd.inc on line 123.
  • Unable to create scaled Original image.

Lance's manifest power rolls over the Piru bridge. Back in 1995 we were able to run really LONG trains since we used the double track modules together to for long sidings and throats for the balloon and wye. When we migrated from using the double track modules in the layout, we lost the ability to run long trains. To this day I feel it was a step back to take a step forward in maintaining a higher track and fidelity quality.